Implementation of Planning Techniques for A Residential Project using PRIMAVERA

Call for Papers

Volume-8 | Issue-6

Last date : 27-Dec-2024

Best International Journal
Open Access | Peer Reviewed | Best International Journal | Indexing & IF | 24*7 Support | Dedicated Qualified Team | Rapid Publication Process | International Editor, Reviewer Board | Attractive User Interface with Easy Navigation

Journal Type : Open Access

First Update : Within 7 Days after submittion

Submit Paper Online

For Author

Research Area


Implementation of Planning Techniques for A Residential Project using PRIMAVERA


Rishikesh G. Shinde | Digvijay S. Kute | Zahid H. Shaikh | Utkarsh M. Tare | Kartik D. Walhekar | Shrunkhal V. Bhagatkar

https://doi.org/10.31142/ijtsrd14352



Rishikesh G. Shinde | Digvijay S. Kute | Zahid H. Shaikh | Utkarsh M. Tare | Kartik D. Walhekar | Shrunkhal V. Bhagatkar "Implementation of Planning Techniques for A Residential Project using PRIMAVERA" Published in International Journal of Trend in Scientific Research and Development (ijtsrd), ISSN: 2456-6470, Volume-2 | Issue-4, June 2018, pp.1477-1483, URL: https://www.ijtsrd.com/papers/ijtsrd14352.pdf

With the onset of High Rise Buildings in metropolitan cities, planning and scheduling has become a major concept to be considered for a smooth execution of construction works. Completing a project within the scheduled time frame and estimated cost is the most challenging task any modern construction manager faces. Whenever he accomplishes this task effectively and efficiently then only the project is said to be successful one. Oracle’s Primavera P6 is an effective tool for determining an ideal schedule for construction activities. This project serves as a perfect reference frame for scheduling different High Rise Buildings. All the important steps like creating an EPS, creating a WBS, linking of activities according to their interdependence and availability of resources, reduction of float values, and determination of Critical Path are clearly exhibited in this report.

Planning, Scheduling, High Rise Buildings, Primavera, Critical Path, Gantt Charts.


IJTSRD14352
Volume-2 | Issue-4, June 2018
1477-1483
IJTSRD | www.ijtsrd.com | E-ISSN 2456-6470
Copyright © 2019 by author(s) and International Journal of Trend in Scientific Research and Development Journal. This is an Open Access article distributed under the terms of the Creative Commons Attribution License (CC BY 4.0) (http://creativecommons.org/licenses/by/4.0)

International Journal of Trend in Scientific Research and Development - IJTSRD having online ISSN 2456-6470. IJTSRD is a leading Open Access, Peer-Reviewed International Journal which provides rapid publication of your research articles and aims to promote the theory and practice along with knowledge sharing between researchers, developers, engineers, students, and practitioners working in and around the world in many areas like Sciences, Technology, Innovation, Engineering, Agriculture, Management and many more and it is recommended by all Universities, review articles and short communications in all subjects. IJTSRD running an International Journal who are proving quality publication of peer reviewed and refereed international journals from diverse fields that emphasizes new research, development and their applications. IJTSRD provides an online access to exchange your research work, technical notes & surveying results among professionals throughout the world in e-journals. IJTSRD is a fastest growing and dynamic professional organization. The aim of this organization is to provide access not only to world class research resources, but through its professionals aim to bring in a significant transformation in the real of open access journals and online publishing.

Thomson Reuters
Google Scholer
Academia.edu

ResearchBib
Scribd.com
archive

PdfSR
issuu
Slideshare

WorldJournalAlerts
Twitter
Linkedin