I International Journal of Trend in Scientific Research and Development (IJTSRD) ISSN: 2456International Journal of Trend in Scientific Research and Development (IJTSRD) ISSN: 2456nternational Journal of Trend in Scientific Research and Development (IJTSRD) ISSN: 2456-6470
                                                   nd
                                  Special Issue of Special Issue of 2  International Congress of Engineering
               . 1   96 *  . 0  915 2  . 1   7934 2         study was carried out sixty-eight times, which means eight times, which means
         n       5          5        . 0 (  3586)3586  2    . 0  1286   1 that those sixty-eight times are enough.eight times are enough.
                         
                              

                                                              Simulation  of  the  process.  In  this  phase  the  model In  this  phase  the  model
        The study indicated that using 95% reliability, a 5 of The study indicated that using 95% reliability, a 5 of   w
                                                                was  built  with  time  in  ProModel®  specialized as  built  with  time  in  ProModel®  specialized
        allowed error and a standard deviation of 0.915 for the allowed error and a standard deviation of 0.915 for the   s
                                                                software  in  its  student  version.  Figure  4  shows  an oftware  in  its  student  version.  Figure  4  shows  an
        activity  of  the  warehouse,  will  be  needed  0.1286 activity  of  the  warehouse,  will  be  needed  0.1286   e
                                                                example  of  the  model  constructed  with  specialized xample  of  the  model  constructed  with  specialized
        samples,  if  rounding  this  number  to  the  greater rounding  this  number  to  the  greater   software.
        integer, would be a sample of time. Which means that integer, would be a sample of time. Which means that
        with a time-out is more than enough, the preliminary out is more than enough, the preliminary
































                                 Figure 4. Example of model built in ProModel® software.Example of model built in ProModel® software.

       Analysis of results. Once the model was made in ProModel® software, the results of the production process Once the model was made in ProModel® software, the results of the production process Once the model was made in ProModel® software, the results of the production process
        were examined. Figure 5 represents an ewere examined. Figure 5 represents an example of the results of specialized software.


















                                 Figure 5. Example of the results of the production processFigure 5. Example of the results of the production process

        Continuing  with  the  analysis  of  the  results,  Table  1Continuing  with  the  analysis  of  the  results,  Table  1  represents  the  indicators  of  the  production  process.represents  the  indicators  of  the  production  process.




        @ IJTSRD  |  Available Online @ www.ijtsrd.com@ IJTSRD  |  Available Online @ www.ijtsrd.com |  Special Issue Publication  |  NovemberNovember 2017             P - 15
   32   33   34   35   36   37   38   39   40   41   42